SE "Pavlograd Chemical Plant". Turnkey construction of power center to provide technological heat and electricity production , Pavlograd, 2017-2018

As a part of the development of technological production and the introduction of energy efficient technologies at the plant, the design work was completed, equipment was delivered, «turnkey» construction and installation work were done of the power center to provide technological heat and electricity production in the cogeneration power plant 600kW based on the MWM TCG 2016V12 and the supply of thermal oil boilers by company Ascentec, with a capacity of 720kW.